Homeowner guide
How long before you can walk or drive on new concrete?
Short answer
As a general rule, you can walk on new concrete after about a day or two, drive a regular car on a new driveway after about a week, and park heavy vehicles or apply most sealers after about four weeks, when concrete reaches most of its design strength. Hot, dry or windy weather speeds up drying but can weaken the surface if the slab isn't kept moist. Alonso tells you the exact timing for your pour.

Curing is not the same as drying
Concrete hardens through a chemical reaction with water, and it keeps gaining strength for weeks. A slab can look dry the next morning and still be weak. Keeping it moist in the first days, especially in summer, gives a stronger surface that is less likely to dust or crack.
A typical timeline
First day: keep people, pets and sprinklers off. After a day or two: light foot traffic. After about a week: regular cars on a new driveway, avoiding sharp turns of the wheels in place. After about four weeks: heavy trucks, RVs and dumpsters, and most sealers. These are general guidelines; mix, thickness and weather change them.
East Bay weather
Inland summer heat in towns like Concord, Antioch, Brentwood and San Ramon dries the surface fast, so timing the pour and keeping the slab moist matters. Cool winter days slow curing, so you may wait a little longer before driving on it. Rain right after a pour can mark the surface, which is why we watch the forecast.